Weston House

Completion

We are really happy with the high quality of finish on this recently completed project – a double extension to a house originally built in 2012…The landscape work is due to be done soon to complete the picture, but the house has been transformed by having the garage turned into a gym and utility space, with a new study at the front of the house as well as  the kitchen being enlarged to include a sitting area.   

The architectural highlight are the slender load bearing stone mullions which reference the original Arts and Crafts style house, and link the two separate extensions.  Well done to Skeletal Engineering for avoiding a steel structure and to Build Twenty Two for the high quality masonry! 

Status – Completed July 2023 

Contract value – Confidential 

Design Team: Structural Engineer – Skeletal

Main Contractor – Build Twenty Two 

We are really happy with the high quality of finish on this recently completed project – a double extension to a house originally built in 2012….The landscape work is due to be done soon to complete the picture, but the house has been transformed by having the garage turned into a gym and utility