Westonbirt

Masterplan

Westonbirt Schools ( Pre prep, prep and Senior) had recently become coeducational and were undergoing rapid expansion, whilst at the same time trying to predict the future balance between day and boarding education. The existing facilities were in some areas completely inadequate to meet modern expectations, and had lacked long term investment for many years. Westonbirt House and the Grounds are both Grade 1 listed.

Designscape Architects were commissioned in 2020 alongside Greenhalgh Landscape Architects to develop a 10 year masterplan for Westonbirt Schools. Working through a series of options in a collaborative process with Historic England and the Local Planning Authority, we developed a masterplan which included the provision of new sports facilities, – including a full size, floodlit Astro hockey pitch – new teaching spaces and dining facilities. The whole plan included a rethink and expansion of the parking on the site, and a comprehensive pedestrian circulation and wayfinding strategy, which presented the possibility of significant “heritage gains”. We also devised a strategy to consign the old oil fired boiler systems to history, and move towards a renewable energy strategy for all the buildings.

Project Update: School Masterplan

Designscape have teamed up with Greenhalgh Landscape Architecture to deliver a Vision Document and Masterplan for the future of Westonbirt Schools.

Designscape have teamed up with Greenhalgh Landscape Architecture to deliver a Vision Document and Masterplan for the future of Westonbirt Schools.