Resource Recovery Park – Construction Progress
![](https://www.dscape.co.uk/wp-content/uploads/2020/01/designscape-architects-bath-insights-resource-recovery-park-construction-progress.jpg)
Construction of this waste to energy plant is progressing with erection of ground floor RC walls which contain the main 144m x 30m waste processing hall.
Tagged resource recovery, waste to energy
Construction of this waste to energy plant is progressing with erection of ground floor RC walls which contain the main 144m x 30m waste processing hall.
Designscape Architects Ltd, Bath Brewery, Toll Bridge Road, Bath, BA1 7DE
Registered in England and Wales 5532507